We hire towers, so you would expect us to say a tower is always the answer. It is not, and recommending one for a job that does not need it is a good way to have a customer who never comes back.

Here is the comparison as we would give it on the phone.

The question that decides it

Not "how high" — "how long will you be up there, and what are your hands doing?"

The Work at Height Regulations 2005 are built around that idea. Ladders are acceptable for short-duration, low-risk work where you can maintain three points of contact. As soon as the work takes longer, needs two hands, or needs tools and materials at height, the equipment has to change.

A ladder is the right tool when

  • The job takes minutes, not hours.
  • You can keep three points of contact — one hand for the ladder throughout.
  • You are not carrying anything heavy up or working out to the side.
  • There is somewhere flat and firm to foot it, and something solid to lean it on.

Clearing one blocked gutter section, checking a light, taking a look at a slipped tile. Fine.

A podium step is the right tool when

  • The work is indoors or on flat hard standing.
  • The height is roughly one to two metres of platform.
  • You want a guarded platform and both hands free, but a full tower would be overkill.

Ceilings, coving, light fittings, high shelving, shop fit-out. A podium goes up in seconds, has a guardrail, and takes up very little floor. For a room full of ceiling work it is usually a better answer than a tower.

A scaffold tower is the right tool when

  • The work takes hours or days at the same height.
  • You need both hands, plus tools and materials on a platform.
  • You are working along an elevation, not at a single point.
  • You need to be above about two metres of platform height.

Painting a whole elevation, replacing fascias and soffits, rendering, repointing, window fitting, board work. In all of those, the tower is not just safer — it is faster, because you stop climbing up and down for every tool you forgot.

Where a tower is the wrong answer

Worth being blunt about:

  • Sloping or stepped ground. A mobile tower needs a level base — every one of them,

ours included. Working over a flight of stairs needs a tower designed for it, with independently adjustable legs. We do not carry one, so if that is your job, call us and we will say so rather than sell you a mobile tower and optimism.

  • Anything that needs to be loaded from the structure. A tower carries people and hand

tools, not building materials by the pallet.

  • Live overhead lines. Aluminium conducts. Where there are cables, the answer is not a

taller tower, it is a different plan.

  • A single five-minute job at first-floor height. Hiring a tower for the week to change

one bulb is money you do not need to spend.

The cost comparison people forget

A ladder you own is cheaper than a tower you hire — for the first hour.

Over a three-day painting job, the tower wins on time alone: you carry a tin and a brush up once instead of thirty times, you work along the wall instead of repositioning constantly, and you finish a full elevation without coming down. Weekly hire on a domestic-sized tower is less than a day's labour, and it usually buys back more than a day.

That is the actual comparison — not tower versus ladder, but tower versus the hours you spend on the ladder.

Still weighing it up?

How to choose a scaffold tower works through the four questions in order, and the height guide turns your measurement into a working height. If you want a straight opinion on whether your job needs a tower at all, call the number at the top of the page — we would rather tell you it does not than hire you the wrong thing.