{"title":"Single Width Scaffold Tower Hire","description":"","products":[{"product_id":"single-width-scaffold-tower-hire-4m","title":"4m Single Width Scaffold Tower Hire — 1.8m x 0.75m Platform","description":"\u003cp\u003eHire a \u003cstrong\u003e4m single width scaffold tower\u003c\/strong\u003e in London from \u003cstrong\u003e£109.99 a week\u003c\/strong\u003e, delivered free within 30km of our Cheshunt yard and collected at the end of your hire. 3.81m working height on a doorway-width tower with a usable run, 1.8m x 0.75m.\u003c\/p\u003e\n\n\u003ch2\u003eWhat a 4m tower is for\u003c\/h2\u003e\n\u003cp\u003eA 3.81m working height puts you at the gutter line of a bungalow, the ground floor of a house, or a normal interior ceiling with room to work above your head. It is the height most decorating, first-fix electrical and light maintenance jobs actually need — and the one people most often over-buy.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eInterior ceilings, coving and cornice\u003c\/li\u003e\n\u003cli\u003eLight fittings, smoke detectors and ceiling roses\u003c\/li\u003e\n\u003cli\u003eGround-floor windows, fascias and soffits\u003c\/li\u003e\n\u003cli\u003eShop and office fit-out, signage and display\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eMostly hired by \u003ca href=\"\/pages\/use-cases\/decorators\"\u003edecorators\u003c\/a\u003e, \u003ca href=\"\/pages\/use-cases\/painters\"\u003epainters\u003c\/a\u003e, \u003ca href=\"\/pages\/use-cases\/electricians\"\u003eelectricians\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eIs 3.81m the right height for you?\u003c\/h2\u003e\n\u003cp\u003eYou stand on the platform at \u003cstrong\u003e1.81m\u003c\/strong\u003e and work comfortably to about \u003cstrong\u003e3.8m\u003c\/strong\u003e — that reaches the gutter of a bungalow, a garage roof or a shopfront fascia. Measure to the highest point you actually need to touch and take off roughly two metres; if the number you are left with is near 3.81, this is your tower. Working lower than that? The \u003ca href=\"\/products\/single-width-scaffold-tower-hire-3m\"\u003e3m version\u003c\/a\u003e works to 2.81m, which reaches a normal domestic ceiling with room to work above your head. Need to go higher? The \u003ca href=\"\/products\/single-width-scaffold-tower-hire-5m\"\u003e5m version\u003c\/a\u003e works to 4.74m, which reaches a single-storey extension roof and the head of a ground-floor window.\u003c\/p\u003e\n\u003cp\u003eIf you are between two heights, the \u003ca href=\"\/pages\/scaffold-tower-height-guide\"\u003eheight guide\u003c\/a\u003e works through it, and \u003ca href=\"\/pages\/how-to-choose-a-scaffold-tower\"\u003ehow to choose a scaffold tower\u003c\/a\u003e covers the rest of the decision.\u003c\/p\u003e\n\n\u003ch2\u003eWill it fit, and can you get it there?\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003e1.8m x 0.75m\u003c\/strong\u003e keeps the 750mm width that gets through a standard internal doorway, a side return or a communal corridor, while giving you 1.8m of platform to work along. It is the balance most interior and terrace work wants.\u003c\/p\u003e\n\u003cp\u003eCheck the turn as well as the doorway — a hallway with a tight corner can stop a 1.8m component even when the door is wide enough. The \u003ca href=\"\/pages\/scaffold-tower-size-guide\"\u003esize guide\u003c\/a\u003e covers measuring the narrowest point, the floor area including stabilisers, and the clear height you need while building.\u003c\/p\u003e\n\n\n\u003ch2\u003eSpecification\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eWorking height:\u003c\/strong\u003e 3.81m \u003cem\u003e— the highest point you can comfortably reach\u003c\/em\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePlatform height:\u003c\/strong\u003e 1.81m \u003cem\u003e— the deck you stand on\u003c\/em\u003e\n\u003c\/li\u003e\n\n\u003cli\u003e\n\u003cstrong\u003eTower footprint:\u003c\/strong\u003e 1.8m x 0.75m\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBoarded deck:\u003c\/strong\u003e 1.80m x 0.60m\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTower width:\u003c\/strong\u003e 750mm\u003c\/li\u003e\n\n\u003cli\u003e\n\u003cstrong\u003eGuardrail system:\u003c\/strong\u003e Advanced (AGR)\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStandard:\u003c\/strong\u003e EN 1004\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSafe working load:\u003c\/strong\u003e on the manufacturer's plate and in the assembly guide supplied with the tower\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eWhat is in the load\u003c\/h2\u003e\n\u003cp\u003eEvery part of this configuration, with the manufacturer's part codes and weights. Worth a\ncount on delivery, and worth a look before you plan the carry.\u003c\/p\u003e\n\u003ctable\u003e\n\u003cthead\u003e\u003ctr\u003e\n\u003cth\u003ePart\u003c\/th\u003e\n\u003cth\u003eQty\u003c\/th\u003e\n\u003cth\u003eEach\u003c\/th\u003e\n\u003c\/tr\u003e\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eMCKAT \u003cem\u003e(katlanir taban, hepsinde var)\u003c\/em\u003e\n\u003c\/td\u003e\n\u003ctd\u003e1\u003c\/td\u003e\n\u003ctd\u003e16.4kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMC-2000X750\u003c\/td\u003e\n\u003ctd\u003e2\u003c\/td\u003e\n\u003ctd\u003e7.8kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMYTY-1850\u003c\/td\u003e\n\u003ctd\u003e2\u003c\/td\u003e\n\u003ctd\u003e1.8kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eSAFEKOR-1800X1250\u003c\/td\u003e\n\u003ctd\u003e4\u003c\/td\u003e\n\u003ctd\u003e6.2kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMTKR-150\u003c\/td\u003e\n\u003ctd\u003e4\u003c\/td\u003e\n\u003ctd\u003e4.7kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMKPLT-1800X600\u003c\/td\u003e\n\u003ctd\u003e1\u003c\/td\u003e\n\u003ctd\u003e14kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMPAY-2000\u003c\/td\u003e\n\u003ctd\u003e4\u003c\/td\u003e\n\u003ctd\u003e4.7kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMTEK-1800X750\u003c\/td\u003e\n\u003ctd\u003e1\u003c\/td\u003e\n\u003ctd\u003e7.5kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eYAYLI PIM\u003c\/td\u003e\n\u003ctd\u003e4\u003c\/td\u003e\n\u003ctd\u003e0.1kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\n\u003c\/table\u003e\n\n\u003ch2\u003eWhat comes with the hire\u003c\/h2\u003e\n\u003ch3\u003eAdvanced guardrail (AGR) build-up\u003c\/h3\u003e\n\u003cp\u003eOn a standard tower you climb to the new level and fit its guardrail once you are\nstanding there. On this one the guardrail frame is raised into place \u003cstrong\u003efrom the platform\nbelow\u003c\/strong\u003e and locked before anyone steps up, so no operative ever stands on an unprotected\nlevel while the tower goes up or comes down.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHire this one if:\u003c\/strong\u003e you are on a managed or principal-contractor site, AGR\nor \"collective fall protection during assembly\" is written into the RAMS or method statement, your\nclient audits build-up method, or the tower goes up and down repeatedly through the job.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eThe standard tower is enough if:\u003c\/strong\u003e you are a sole trader or small team on\ndomestic work, you build the tower once and leave it up, and nobody is asking you to evidence the\nassembly method. It is the same aluminium, the same platform, the same working height and the same\nguardrails once the tower is built — the difference is entirely in how those guardrails get\nthere.\u003c\/p\u003e\n\u003cp\u003eThe AGR version is \u003cstrong\u003e£20 a week more\u003c\/strong\u003e. That is the whole difference in price, and\nwe would rather you hired the cheaper one than paid for a specification nobody asked you for.\u003c\/p\u003e\n\n\u003ch3\u003eInspected before it leaves the yard\u003c\/h3\u003e\n\u003cp\u003eFrames, braces, platforms, guardrails, toeboards and castors are checked on every turnaround. Anything bent, cracked or worn comes out of service rather than going back on the shelf. See our \u003ca href=\"\/pages\/safety-and-quality\"\u003esafety and quality standards\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eWhat the weekly price covers\u003c\/h2\u003e\n\u003cp\u003eThe figure on this page is what you pay. Guardrails, toeboards, stabilisers and lockable\ncastors come with the tower, not on the invoice — and there is \u003cstrong\u003eno deposit and no card\nhold\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded:\u003c\/strong\u003e delivery and collection within 30km of our Cheshunt yard\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e£45:\u003c\/strong\u003e delivery and collection beyond 30km — both legs, once per order\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eOptional:\u003c\/strong\u003e installation and dismantling, if nobody on your team is PASMA trained\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eVAT:\u003c\/strong\u003e included in the price shown, never added at checkout\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eThe full line-by-line list — what is in the price and what is not — is in the\n\u003ca href=\"\/pages\/hire-terms\"\u003ehire terms\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eHow this tower goes up\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eWho may build it:\u003c\/strong\u003e under the Work at Height Regulations 2005 a tower must be\nassembled by someone competent to do it — in practice, PASMA trained on this type of tower. If\nnobody on your team holds that, add our optional installation service and we will build it on\ndelivery and take it down at collection.\u003c\/p\u003e\n\u003cp\u003eThese are the manufacturer's own assembly diagrams for this configuration. The full guide\ncomes with the tower.\u003c\/p\u003e\n\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/p42.png?v=1787661039\" alt=\"Assembly sequence for the 5M tower, manufacturer diagram\" loading=\"lazy\" width=\"900\"\u003e\n\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/p43.png?v=1787661044\" alt=\"Assembly sequence for the 5M tower, manufacturer diagram\" loading=\"lazy\" width=\"900\"\u003e\n\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/p44.png?v=1787661048\" alt=\"Assembly sequence for the 5M tower, manufacturer diagram\" loading=\"lazy\" width=\"900\"\u003e\n\u003cp\u003e\u003cstrong\u003eBuild sequence for the 5M:\u003c\/strong\u003e steps 1-2-3-4-5-6-7-8-9-10-14-11-17, following the numbered diagrams above.\u003c\/p\u003e\n\u003cp\u003eDismantling is the same sequence in reverse. The\n\u003ca href=\"\/blogs\/blog\/how-to-put-up-a-scaffold-tower\"\u003eassembly guide\u003c\/a\u003e explains the principle\nbehind the order, and the \u003ca href=\"\/pages\/pasma-guide\"\u003ePASMA guide\u003c\/a\u003e covers the training.\u003c\/p\u003e\n\n\u003ch2\u003eThe manufacturer's limits\u003c\/h2\u003e\n\u003cp\u003eFrom the assembly and use manual supplied with this tower — the manufacturer's figures, not\nour interpretation of them.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eWind:\u003c\/strong\u003e stop work above \u003cstrong\u003e38 km\/h\u003c\/strong\u003e (about 24 mph, Beaufort 6), and never try to move the tower in wind.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eGround:\u003c\/strong\u003e level, flat and firm. On soft ground put base plates or U-profiles under the castors.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eAssembly:\u003c\/strong\u003e two people minimum, and both trained on this type of tower.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eCertified to \u003cstrong\u003eEN 1004\u003c\/strong\u003e. The full set of limits — loading, sheeting, inspection\nintervals and what the tower must never be used for — is on the\n\u003ca href=\"\/pages\/scaffold-tower-safety-guide\"\u003esafety guide\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eOther sizes and configurations\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003ca href=\"\/products\/single-width-scaffold-tower-hire-3m\"\u003e3m Single Width Scaffold Tower Hire — 1.8m x 0.75m Platform\u003c\/a\u003e — one size down\u003c\/li\u003e\n\u003cli\u003e\n\u003ca href=\"\/products\/single-width-scaffold-tower-hire-5m\"\u003e5m Single Width Scaffold Tower Hire — 1.8m x 0.75m Platform\u003c\/a\u003e — one size up\u003c\/li\u003e\n\u003c\/ul\u003e\u003cp\u003eOr see every size in the range on the \u003ca href=\"\/collections\/single-width-scaffold-tower-hire\"\u003esingle width scaffold tower hire collection\u003c\/a\u003e, and the full fleet under \u003ca href=\"\/collections\/scaffold-tower-hire\"\u003escaffold tower hire\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eDelivery, collection and hire terms\u003c\/h2\u003e\n\u003cp\u003eDelivery and collection are \u003cstrong\u003efree within 30km\u003c\/strong\u003e of our Cheshunt yard — North and East London, south Hertfordshire and west Essex — and a flat \u003cstrong\u003e£45\u003c\/strong\u003e for both legs beyond that. Enter your postcode above and you will see which applies, plus your earliest date and slot, before you pay. See \u003ca href=\"\/pages\/delivery-information\"\u003edelivery information\u003c\/a\u003e and \u003ca href=\"\/pages\/delivery-areas\"\u003eevery area we cover\u003c\/a\u003e.\u003c\/p\u003e\n\u003cp\u003eMinimum hire is one week; a single day is charged as one week. The weekly rate drops from four weeks, and 15% comes off automatically when you hire three or more towers on one order. No deposit is held on your card. Full detail in our \u003ca href=\"\/pages\/hire-terms\"\u003ehire terms\u003c\/a\u003e.\u003c\/p\u003e","brand":"London Scaffold Tower Hire","offers":[{"title":"1 Week","offer_id":58521878397302,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-4M-1W","price":109.99,"currency_code":"GBP","in_stock":true},{"title":"2 Weeks","offer_id":58521878430070,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-4M-2W","price":186.99,"currency_code":"GBP","in_stock":true},{"title":"3 Weeks","offer_id":58521878462838,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-4M-3W","price":263.99,"currency_code":"GBP","in_stock":true},{"title":"4 Weeks","offer_id":58521878495606,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-4M-4W","price":329.99,"currency_code":"GBP","in_stock":true},{"title":"5 Weeks","offer_id":58521878528374,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-4M-5W","price":395.99,"currency_code":"GBP","in_stock":true},{"title":"6 Weeks","offer_id":58521878561142,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-4M-6W","price":461.99,"currency_code":"GBP","in_stock":true},{"title":"7 Weeks","offer_id":58521878593910,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-4M-7W","price":521.99,"currency_code":"GBP","in_stock":true},{"title":"8 Weeks","offer_id":58521878626678,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-4M-8W","price":582.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/manual-single-width-scaffold-tower-hire-4m.png?v=1787684254"},{"product_id":"single-width-scaffold-tower-hire-5m","title":"5m Single Width Scaffold Tower Hire — 1.8m x 0.75m Platform","description":"\u003cp\u003eHire a \u003cstrong\u003e5m single width scaffold tower\u003c\/strong\u003e in London from \u003cstrong\u003e£129.99 a week\u003c\/strong\u003e, delivered free within 30km of our Cheshunt yard and collected at the end of your hire. 4.74m working height on a doorway-width tower with a usable run, 1.8m x 0.75m.\u003c\/p\u003e\n\n\u003ch2\u003eWhat a 5m tower is for\u003c\/h2\u003e\n\u003cp\u003eAt 4.74m you are working at the eaves of a standard two-storey terrace or semi — first-floor windows, guttering, soffits and fascias. Inside, it covers stairwell ceilings, warehouse racking and high-bay lighting in a unit with a normal roof height.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFirst-floor windows, gutters, fascias and soffits\u003c\/li\u003e\n\u003cli\u003eTwo-storey exterior painting and rendering repair\u003c\/li\u003e\n\u003cli\u003eStairwell and double-height interior ceilings\u003c\/li\u003e\n\u003cli\u003eWarehouse racking and high-bay lighting\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eMostly hired by \u003ca href=\"\/pages\/use-cases\/painters\"\u003epainters\u003c\/a\u003e, \u003ca href=\"\/pages\/use-cases\/decorators\"\u003edecorators\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eIs 4.74m the right height for you?\u003c\/h2\u003e\n\u003cp\u003eYou stand on the platform at \u003cstrong\u003e2.74m\u003c\/strong\u003e and work comfortably to about \u003cstrong\u003e4.7m\u003c\/strong\u003e — that reaches a single-storey extension roof and the head of a ground-floor window. Measure to the highest point you actually need to touch and take off roughly two metres; if the number you are left with is near 4.74, this is your tower. Working lower than that? The \u003ca href=\"\/products\/single-width-scaffold-tower-hire-4m\"\u003e4m version\u003c\/a\u003e works to 3.81m, which reaches the gutter of a bungalow, a garage roof or a shopfront fascia. Need to go higher? The \u003ca href=\"\/products\/single-width-scaffold-tower-hire-6m\"\u003e6m version\u003c\/a\u003e works to 5.74m, which reaches the gutter line of a standard two-storey house.\u003c\/p\u003e\n\u003cp\u003eIf you are between two heights, the \u003ca href=\"\/pages\/scaffold-tower-height-guide\"\u003eheight guide\u003c\/a\u003e works through it, and \u003ca href=\"\/pages\/how-to-choose-a-scaffold-tower\"\u003ehow to choose a scaffold tower\u003c\/a\u003e covers the rest of the decision.\u003c\/p\u003e\n\n\u003ch2\u003eWill it fit, and can you get it there?\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003e1.8m x 0.75m\u003c\/strong\u003e keeps the 750mm width that gets through a standard internal doorway, a side return or a communal corridor, while giving you 1.8m of platform to work along. It is the balance most interior and terrace work wants.\u003c\/p\u003e\n\u003cp\u003eCheck the turn as well as the doorway — a hallway with a tight corner can stop a 1.8m component even when the door is wide enough. The \u003ca href=\"\/pages\/scaffold-tower-size-guide\"\u003esize guide\u003c\/a\u003e covers measuring the narrowest point, the floor area including stabilisers, and the clear height you need while building.\u003c\/p\u003e\n\n\n\u003ch2\u003eSpecification\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eWorking height:\u003c\/strong\u003e 4.74m \u003cem\u003e— the highest point you can comfortably reach\u003c\/em\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePlatform height:\u003c\/strong\u003e 2.74m \u003cem\u003e— the deck you stand on\u003c\/em\u003e\n\u003c\/li\u003e\n\n\u003cli\u003e\n\u003cstrong\u003eTower footprint:\u003c\/strong\u003e 1.8m x 0.75m\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBoarded deck:\u003c\/strong\u003e 1.80m x 0.60m\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTower width:\u003c\/strong\u003e 750mm\u003c\/li\u003e\n\n\u003cli\u003e\n\u003cstrong\u003eGuardrail system:\u003c\/strong\u003e Advanced (AGR)\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStandard:\u003c\/strong\u003e EN 1004\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSafe working load:\u003c\/strong\u003e on the manufacturer's plate and in the assembly guide supplied with the tower\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eWhat is in the load\u003c\/h2\u003e\n\u003cp\u003eEvery part of this configuration, with the manufacturer's part codes and weights. Worth a\ncount on delivery, and worth a look before you plan the carry.\u003c\/p\u003e\n\u003ctable\u003e\n\u003cthead\u003e\u003ctr\u003e\n\u003cth\u003ePart\u003c\/th\u003e\n\u003cth\u003eQty\u003c\/th\u003e\n\u003cth\u003eEach\u003c\/th\u003e\n\u003c\/tr\u003e\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eMCKAT \u003cem\u003e(katlanir taban, hepsinde var)\u003c\/em\u003e\n\u003c\/td\u003e\n\u003ctd\u003e1\u003c\/td\u003e\n\u003ctd\u003e16.4kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMC-2000X750\u003c\/td\u003e\n\u003ctd\u003e2\u003c\/td\u003e\n\u003ctd\u003e7.8kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMC-1000X750\u003c\/td\u003e\n\u003ctd\u003e2\u003c\/td\u003e\n\u003ctd\u003e4.2kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMYTY-1850\u003c\/td\u003e\n\u003ctd\u003e2\u003c\/td\u003e\n\u003ctd\u003e1.8kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eSAFEKOR-1800X1250\u003c\/td\u003e\n\u003ctd\u003e6\u003c\/td\u003e\n\u003ctd\u003e6.2kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMTKR-150\u003c\/td\u003e\n\u003ctd\u003e4\u003c\/td\u003e\n\u003ctd\u003e4.7kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMKPLT-1800X600\u003c\/td\u003e\n\u003ctd\u003e2\u003c\/td\u003e\n\u003ctd\u003e14kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMPAY-2000\u003c\/td\u003e\n\u003ctd\u003e4\u003c\/td\u003e\n\u003ctd\u003e4.7kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMTEK-1800X750\u003c\/td\u003e\n\u003ctd\u003e1\u003c\/td\u003e\n\u003ctd\u003e7.5kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eYAYLI PIM\u003c\/td\u003e\n\u003ctd\u003e8\u003c\/td\u003e\n\u003ctd\u003e0.1kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\n\u003c\/table\u003e\n\n\u003ch2\u003eWhat comes with the hire\u003c\/h2\u003e\n\u003ch3\u003eAdvanced guardrail (AGR) build-up\u003c\/h3\u003e\n\u003cp\u003eOn a standard tower you climb to the new level and fit its guardrail once you are\nstanding there. On this one the guardrail frame is raised into place \u003cstrong\u003efrom the platform\nbelow\u003c\/strong\u003e and locked before anyone steps up, so no operative ever stands on an unprotected\nlevel while the tower goes up or comes down.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHire this one if:\u003c\/strong\u003e you are on a managed or principal-contractor site, AGR\nor \"collective fall protection during assembly\" is written into the RAMS or method statement, your\nclient audits build-up method, or the tower goes up and down repeatedly through the job.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eThe standard tower is enough if:\u003c\/strong\u003e you are a sole trader or small team on\ndomestic work, you build the tower once and leave it up, and nobody is asking you to evidence the\nassembly method. It is the same aluminium, the same platform, the same working height and the same\nguardrails once the tower is built — the difference is entirely in how those guardrails get\nthere.\u003c\/p\u003e\n\u003cp\u003eThe AGR version is \u003cstrong\u003e£20 a week more\u003c\/strong\u003e. That is the whole difference in price, and\nwe would rather you hired the cheaper one than paid for a specification nobody asked you for.\u003c\/p\u003e\n\n\u003ch3\u003eInspected before it leaves the yard\u003c\/h3\u003e\n\u003cp\u003eFrames, braces, platforms, guardrails, toeboards and castors are checked on every turnaround. Anything bent, cracked or worn comes out of service rather than going back on the shelf. See our \u003ca href=\"\/pages\/safety-and-quality\"\u003esafety and quality standards\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eWhat the weekly price covers\u003c\/h2\u003e\n\u003cp\u003eThe figure on this page is what you pay. Guardrails, toeboards, stabilisers and lockable\ncastors come with the tower, not on the invoice — and there is \u003cstrong\u003eno deposit and no card\nhold\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded:\u003c\/strong\u003e delivery and collection within 30km of our Cheshunt yard\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e£45:\u003c\/strong\u003e delivery and collection beyond 30km — both legs, once per order\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eOptional:\u003c\/strong\u003e installation and dismantling, if nobody on your team is PASMA trained\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eVAT:\u003c\/strong\u003e included in the price shown, never added at checkout\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eThe full line-by-line list — what is in the price and what is not — is in the\n\u003ca href=\"\/pages\/hire-terms\"\u003ehire terms\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eHow this tower goes up\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eWho may build it:\u003c\/strong\u003e under the Work at Height Regulations 2005 a tower must be\nassembled by someone competent to do it — in practice, PASMA trained on this type of tower. If\nnobody on your team holds that, add our optional installation service and we will build it on\ndelivery and take it down at collection.\u003c\/p\u003e\n\u003cp\u003eThese are the manufacturer's own assembly diagrams for this configuration. The full guide\ncomes with the tower.\u003c\/p\u003e\n\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/p39.png?v=1787661025\" alt=\"Assembly sequence for the 6M tower, manufacturer diagram\" loading=\"lazy\" width=\"900\"\u003e\n\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/p40.png?v=1787661031\" alt=\"Assembly sequence for the 6M tower, manufacturer diagram\" loading=\"lazy\" width=\"900\"\u003e\n\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/p41.png?v=1787661035\" alt=\"Assembly sequence for the 6M tower, manufacturer diagram\" loading=\"lazy\" width=\"900\"\u003e\n\u003cp\u003e\u003cstrong\u003eBuild sequence for the 6M:\u003c\/strong\u003e steps 1-2-3-4-5-6-7-8-9-10-11-12-13-14-15-16-17, following the numbered diagrams above.\u003c\/p\u003e\n\u003cp\u003eDismantling is the same sequence in reverse. The\n\u003ca href=\"\/blogs\/blog\/how-to-put-up-a-scaffold-tower\"\u003eassembly guide\u003c\/a\u003e explains the principle\nbehind the order, and the \u003ca href=\"\/pages\/pasma-guide\"\u003ePASMA guide\u003c\/a\u003e covers the training.\u003c\/p\u003e\n\n\u003ch2\u003eThe manufacturer's limits\u003c\/h2\u003e\n\u003cp\u003eFrom the assembly and use manual supplied with this tower — the manufacturer's figures, not\nour interpretation of them.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eWind:\u003c\/strong\u003e stop work above \u003cstrong\u003e38 km\/h\u003c\/strong\u003e (about 24 mph, Beaufort 6), and never try to move the tower in wind.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eGround:\u003c\/strong\u003e level, flat and firm. On soft ground put base plates or U-profiles under the castors.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eAssembly:\u003c\/strong\u003e two people minimum, and both trained on this type of tower.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStabilisers:\u003c\/strong\u003e required at this height — out to full span before anyone climbs.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eCertified to \u003cstrong\u003eEN 1004\u003c\/strong\u003e. The full set of limits — loading, sheeting, inspection\nintervals and what the tower must never be used for — is on the\n\u003ca href=\"\/pages\/scaffold-tower-safety-guide\"\u003esafety guide\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eOther sizes and configurations\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003ca href=\"\/products\/single-width-scaffold-tower-hire-4m\"\u003e4m Single Width Scaffold Tower Hire — 1.8m x 0.75m Platform\u003c\/a\u003e — one size down\u003c\/li\u003e\n\u003cli\u003e\n\u003ca href=\"\/products\/single-width-scaffold-tower-hire-6m\"\u003e6m Single Width Scaffold Tower Hire — 1.8m x 0.75m Platform\u003c\/a\u003e — one size up\u003c\/li\u003e\n\u003c\/ul\u003e\u003cp\u003eOr see every size in the range on the \u003ca href=\"\/collections\/single-width-scaffold-tower-hire\"\u003esingle width scaffold tower hire collection\u003c\/a\u003e, and the full fleet under \u003ca href=\"\/collections\/scaffold-tower-hire\"\u003escaffold tower hire\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eDelivery, collection and hire terms\u003c\/h2\u003e\n\u003cp\u003eDelivery and collection are \u003cstrong\u003efree within 30km\u003c\/strong\u003e of our Cheshunt yard — North and East London, south Hertfordshire and west Essex — and a flat \u003cstrong\u003e£45\u003c\/strong\u003e for both legs beyond that. Enter your postcode above and you will see which applies, plus your earliest date and slot, before you pay. See \u003ca href=\"\/pages\/delivery-information\"\u003edelivery information\u003c\/a\u003e and \u003ca href=\"\/pages\/delivery-areas\"\u003eevery area we cover\u003c\/a\u003e.\u003c\/p\u003e\n\u003cp\u003eMinimum hire is one week; a single day is charged as one week. The weekly rate drops from four weeks, and 15% comes off automatically when you hire three or more towers on one order. No deposit is held on your card. Full detail in our \u003ca href=\"\/pages\/hire-terms\"\u003ehire terms\u003c\/a\u003e.\u003c\/p\u003e","brand":"London Scaffold Tower Hire","offers":[{"title":"1 Week","offer_id":58521878724982,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-5M-1W","price":129.99,"currency_code":"GBP","in_stock":true},{"title":"2 Weeks","offer_id":58521878757750,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-5M-2W","price":220.99,"currency_code":"GBP","in_stock":true},{"title":"3 Weeks","offer_id":58521878790518,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-5M-3W","price":311.99,"currency_code":"GBP","in_stock":true},{"title":"4 Weeks","offer_id":58521878823286,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-5M-4W","price":389.99,"currency_code":"GBP","in_stock":true},{"title":"5 Weeks","offer_id":58521878856054,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-5M-5W","price":467.99,"currency_code":"GBP","in_stock":true},{"title":"6 Weeks","offer_id":58521878888822,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-5M-6W","price":545.99,"currency_code":"GBP","in_stock":true},{"title":"7 Weeks","offer_id":58521878921590,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-5M-7W","price":616.99,"currency_code":"GBP","in_stock":true},{"title":"8 Weeks","offer_id":58521878954358,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-5M-8W","price":688.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/manual-single-width-scaffold-tower-hire-5m.png?v=1787684254"},{"product_id":"single-width-scaffold-tower-hire-6m","title":"6m Single Width Scaffold Tower Hire — 1.8m x 0.75m Platform","description":"\u003cp\u003eHire a \u003cstrong\u003e6m single width scaffold tower\u003c\/strong\u003e in London from \u003cstrong\u003e£149.99 a week\u003c\/strong\u003e, delivered free within 30km of our Cheshunt yard and collected at the end of your hire. 5.74m working height on a doorway-width tower with a usable run, 1.8m x 0.75m.\u003c\/p\u003e\n\n\u003ch2\u003eWhat a 6m tower is for\u003c\/h2\u003e\n\u003cp\u003eAt 5.74m you are working at the eaves of a standard two-storey terrace or semi — first-floor windows, guttering, soffits and fascias. Inside, it covers stairwell ceilings, warehouse racking and high-bay lighting in a unit with a normal roof height.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFirst-floor windows, gutters, fascias and soffits\u003c\/li\u003e\n\u003cli\u003eTwo-storey exterior painting and rendering repair\u003c\/li\u003e\n\u003cli\u003eStairwell and double-height interior ceilings\u003c\/li\u003e\n\u003cli\u003eWarehouse racking and high-bay lighting\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eMostly hired by \u003ca href=\"\/pages\/use-cases\/painters\"\u003epainters\u003c\/a\u003e, \u003ca href=\"\/pages\/use-cases\/decorators\"\u003edecorators\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eIs 5.74m the right height for you?\u003c\/h2\u003e\n\u003cp\u003eYou stand on the platform at \u003cstrong\u003e3.74m\u003c\/strong\u003e and work comfortably to about \u003cstrong\u003e5.7m\u003c\/strong\u003e — that reaches the gutter line of a standard two-storey house. Measure to the highest point you actually need to touch and take off roughly two metres; if the number you are left with is near 5.74, this is your tower. Working lower than that? The \u003ca href=\"\/products\/single-width-scaffold-tower-hire-5m\"\u003e5m version\u003c\/a\u003e works to 4.74m, which reaches a single-storey extension roof and the head of a ground-floor window. Need to go higher? The \u003ca href=\"\/products\/single-width-scaffold-tower-hire-8m\"\u003e8m version\u003c\/a\u003e works to 7.84m, which reaches the roofline and bargeboards of a two-storey house.\u003c\/p\u003e\n\u003cp\u003eIf you are between two heights, the \u003ca href=\"\/pages\/scaffold-tower-height-guide\"\u003eheight guide\u003c\/a\u003e works through it, and \u003ca href=\"\/pages\/how-to-choose-a-scaffold-tower\"\u003ehow to choose a scaffold tower\u003c\/a\u003e covers the rest of the decision.\u003c\/p\u003e\n\n\u003ch2\u003eWill it fit, and can you get it there?\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003e1.8m x 0.75m\u003c\/strong\u003e keeps the 750mm width that gets through a standard internal doorway, a side return or a communal corridor, while giving you 1.8m of platform to work along. It is the balance most interior and terrace work wants.\u003c\/p\u003e\n\u003cp\u003eCheck the turn as well as the doorway — a hallway with a tight corner can stop a 1.8m component even when the door is wide enough. The \u003ca href=\"\/pages\/scaffold-tower-size-guide\"\u003esize guide\u003c\/a\u003e covers measuring the narrowest point, the floor area including stabilisers, and the clear height you need while building.\u003c\/p\u003e\n\n\n\u003ch2\u003eSpecification\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eWorking height:\u003c\/strong\u003e 5.74m \u003cem\u003e— the highest point you can comfortably reach\u003c\/em\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePlatform height:\u003c\/strong\u003e 3.74m \u003cem\u003e— the deck you stand on\u003c\/em\u003e\n\u003c\/li\u003e\n\n\u003cli\u003e\n\u003cstrong\u003eTower footprint:\u003c\/strong\u003e 1.8m x 0.75m\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBoarded deck:\u003c\/strong\u003e 1.80m x 0.60m\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTower width:\u003c\/strong\u003e 750mm\u003c\/li\u003e\n\n\u003cli\u003e\n\u003cstrong\u003eGuardrail system:\u003c\/strong\u003e Advanced (AGR)\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStandard:\u003c\/strong\u003e EN 1004\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSafe working load:\u003c\/strong\u003e on the manufacturer's plate and in the assembly guide supplied with the tower\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eWhat is in the load\u003c\/h2\u003e\n\u003cp\u003eEvery part of this configuration, with the manufacturer's part codes and weights. Worth a\ncount on delivery, and worth a look before you plan the carry.\u003c\/p\u003e\n\u003ctable\u003e\n\u003cthead\u003e\u003ctr\u003e\n\u003cth\u003ePart\u003c\/th\u003e\n\u003cth\u003eQty\u003c\/th\u003e\n\u003cth\u003eEach\u003c\/th\u003e\n\u003c\/tr\u003e\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eMCKAT \u003cem\u003e(katlanir taban, hepsinde var)\u003c\/em\u003e\n\u003c\/td\u003e\n\u003ctd\u003e1\u003c\/td\u003e\n\u003ctd\u003e16.4kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMC-2000X750\u003c\/td\u003e\n\u003ctd\u003e4\u003c\/td\u003e\n\u003ctd\u003e7.8kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMYTY-1850\u003c\/td\u003e\n\u003ctd\u003e2\u003c\/td\u003e\n\u003ctd\u003e1.8kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eSAFEKOR-1800X1250\u003c\/td\u003e\n\u003ctd\u003e6\u003c\/td\u003e\n\u003ctd\u003e6.2kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMTKR-150\u003c\/td\u003e\n\u003ctd\u003e4\u003c\/td\u003e\n\u003ctd\u003e4.7kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMKPLT-1800X600\u003c\/td\u003e\n\u003ctd\u003e2\u003c\/td\u003e\n\u003ctd\u003e14kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMPAY-2000\u003c\/td\u003e\n\u003ctd\u003e4\u003c\/td\u003e\n\u003ctd\u003e4.7kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMTEK-1800X750\u003c\/td\u003e\n\u003ctd\u003e1\u003c\/td\u003e\n\u003ctd\u003e7.5kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eYAYLI PIM\u003c\/td\u003e\n\u003ctd\u003e8\u003c\/td\u003e\n\u003ctd\u003e0.1kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\n\u003c\/table\u003e\n\n\u003ch2\u003eWhat comes with the hire\u003c\/h2\u003e\n\u003ch3\u003eAdvanced guardrail (AGR) build-up\u003c\/h3\u003e\n\u003cp\u003eOn a standard tower you climb to the new level and fit its guardrail once you are\nstanding there. On this one the guardrail frame is raised into place \u003cstrong\u003efrom the platform\nbelow\u003c\/strong\u003e and locked before anyone steps up, so no operative ever stands on an unprotected\nlevel while the tower goes up or comes down.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHire this one if:\u003c\/strong\u003e you are on a managed or principal-contractor site, AGR\nor \"collective fall protection during assembly\" is written into the RAMS or method statement, your\nclient audits build-up method, or the tower goes up and down repeatedly through the job.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eThe standard tower is enough if:\u003c\/strong\u003e you are a sole trader or small team on\ndomestic work, you build the tower once and leave it up, and nobody is asking you to evidence the\nassembly method. It is the same aluminium, the same platform, the same working height and the same\nguardrails once the tower is built — the difference is entirely in how those guardrails get\nthere.\u003c\/p\u003e\n\u003cp\u003eThe AGR version is \u003cstrong\u003e£20 a week more\u003c\/strong\u003e. That is the whole difference in price, and\nwe would rather you hired the cheaper one than paid for a specification nobody asked you for.\u003c\/p\u003e\n\n\u003ch3\u003eInspected before it leaves the yard\u003c\/h3\u003e\n\u003cp\u003eFrames, braces, platforms, guardrails, toeboards and castors are checked on every turnaround. Anything bent, cracked or worn comes out of service rather than going back on the shelf. See our \u003ca href=\"\/pages\/safety-and-quality\"\u003esafety and quality standards\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eWhat the weekly price covers\u003c\/h2\u003e\n\u003cp\u003eThe figure on this page is what you pay. Guardrails, toeboards, stabilisers and lockable\ncastors come with the tower, not on the invoice — and there is \u003cstrong\u003eno deposit and no card\nhold\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded:\u003c\/strong\u003e delivery and collection within 30km of our Cheshunt yard\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e£45:\u003c\/strong\u003e delivery and collection beyond 30km — both legs, once per order\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eOptional:\u003c\/strong\u003e installation and dismantling, if nobody on your team is PASMA trained\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eVAT:\u003c\/strong\u003e included in the price shown, never added at checkout\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eThe full line-by-line list — what is in the price and what is not — is in the\n\u003ca href=\"\/pages\/hire-terms\"\u003ehire terms\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eHow this tower goes up\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eWho may build it:\u003c\/strong\u003e under the Work at Height Regulations 2005 a tower must be\nassembled by someone competent to do it — in practice, PASMA trained on this type of tower. If\nnobody on your team holds that, add our optional installation service and we will build it on\ndelivery and take it down at collection.\u003c\/p\u003e\n\u003cp\u003eThese are the manufacturer's own assembly diagrams for this configuration. The full guide\ncomes with the tower.\u003c\/p\u003e\n\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/p42.png?v=1787661039\" alt=\"Assembly sequence for the 7M tower, manufacturer diagram\" loading=\"lazy\" width=\"900\"\u003e\n\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/p43.png?v=1787661044\" alt=\"Assembly sequence for the 7M tower, manufacturer diagram\" loading=\"lazy\" width=\"900\"\u003e\n\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/p44.png?v=1787661048\" alt=\"Assembly sequence for the 7M tower, manufacturer diagram\" loading=\"lazy\" width=\"900\"\u003e\n\u003cp\u003e\u003cstrong\u003eBuild sequence for the 7M:\u003c\/strong\u003e steps 1-2-3-4-5-6-7-8-9-10-11-12-13-14-15-16-17, following the numbered diagrams above.\u003c\/p\u003e\n\u003cp\u003eDismantling is the same sequence in reverse. The\n\u003ca href=\"\/blogs\/blog\/how-to-put-up-a-scaffold-tower\"\u003eassembly guide\u003c\/a\u003e explains the principle\nbehind the order, and the \u003ca href=\"\/pages\/pasma-guide\"\u003ePASMA guide\u003c\/a\u003e covers the training.\u003c\/p\u003e\n\n\u003ch2\u003eThe manufacturer's limits\u003c\/h2\u003e\n\u003cp\u003eFrom the assembly and use manual supplied with this tower — the manufacturer's figures, not\nour interpretation of them.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eWind:\u003c\/strong\u003e stop work above \u003cstrong\u003e38 km\/h\u003c\/strong\u003e (about 24 mph, Beaufort 6), and never try to move the tower in wind.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eGround:\u003c\/strong\u003e level, flat and firm. On soft ground put base plates or U-profiles under the castors.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eAssembly:\u003c\/strong\u003e two people minimum, and both trained on this type of tower.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStabilisers:\u003c\/strong\u003e required at this height — out to full span before anyone climbs.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eCertified to \u003cstrong\u003eEN 1004\u003c\/strong\u003e. The full set of limits — loading, sheeting, inspection\nintervals and what the tower must never be used for — is on the\n\u003ca href=\"\/pages\/scaffold-tower-safety-guide\"\u003esafety guide\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eOther sizes and configurations\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003ca href=\"\/products\/single-width-scaffold-tower-hire-5m\"\u003e5m Single Width Scaffold Tower Hire — 1.8m x 0.75m Platform\u003c\/a\u003e — one size down\u003c\/li\u003e\n\u003cli\u003e\n\u003ca href=\"\/products\/single-width-scaffold-tower-hire-8m\"\u003e8m Single Width Scaffold Tower Hire — 1.8m x 0.75m Platform\u003c\/a\u003e — one size up\u003c\/li\u003e\n\u003c\/ul\u003e\u003cp\u003eOr see every size in the range on the \u003ca href=\"\/collections\/single-width-scaffold-tower-hire\"\u003esingle width scaffold tower hire collection\u003c\/a\u003e, and the full fleet under \u003ca href=\"\/collections\/scaffold-tower-hire\"\u003escaffold tower hire\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eDelivery, collection and hire terms\u003c\/h2\u003e\n\u003cp\u003eDelivery and collection are \u003cstrong\u003efree within 30km\u003c\/strong\u003e of our Cheshunt yard — North and East London, south Hertfordshire and west Essex — and a flat \u003cstrong\u003e£45\u003c\/strong\u003e for both legs beyond that. Enter your postcode above and you will see which applies, plus your earliest date and slot, before you pay. See \u003ca href=\"\/pages\/delivery-information\"\u003edelivery information\u003c\/a\u003e and \u003ca href=\"\/pages\/delivery-areas\"\u003eevery area we cover\u003c\/a\u003e.\u003c\/p\u003e\n\u003cp\u003eMinimum hire is one week; a single day is charged as one week. The weekly rate drops from four weeks, and 15% comes off automatically when you hire three or more towers on one order. No deposit is held on your card. Full detail in our \u003ca href=\"\/pages\/hire-terms\"\u003ehire terms\u003c\/a\u003e.\u003c\/p\u003e","brand":"London Scaffold Tower Hire","offers":[{"title":"1 Week","offer_id":58521878987126,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-6M-1W","price":149.99,"currency_code":"GBP","in_stock":true},{"title":"2 Weeks","offer_id":58521879019894,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-6M-2W","price":254.99,"currency_code":"GBP","in_stock":true},{"title":"3 Weeks","offer_id":58521879052662,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-6M-3W","price":359.99,"currency_code":"GBP","in_stock":true},{"title":"4 Weeks","offer_id":58521879085430,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-6M-4W","price":449.99,"currency_code":"GBP","in_stock":true},{"title":"5 Weeks","offer_id":58521879118198,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-6M-5W","price":539.99,"currency_code":"GBP","in_stock":true},{"title":"6 Weeks","offer_id":58521879150966,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-6M-6W","price":629.99,"currency_code":"GBP","in_stock":true},{"title":"7 Weeks","offer_id":58521879183734,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-6M-7W","price":711.99,"currency_code":"GBP","in_stock":true},{"title":"8 Weeks","offer_id":58521879216502,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-6M-8W","price":794.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/manual-single-width-scaffold-tower-hire-6m.png?v=1787684256"},{"product_id":"single-width-scaffold-tower-hire-8m","title":"8m Single Width Scaffold Tower Hire — 1.8m x 0.75m Platform","description":"\u003cp\u003eHire an \u003cstrong\u003e8m single width scaffold tower\u003c\/strong\u003e in London from \u003cstrong\u003e£189.99 a week\u003c\/strong\u003e, delivered free within 30km of our Cheshunt yard and collected at the end of your hire. 7.84m working height on a doorway-width tower with a usable run, 1.8m x 0.75m.\u003c\/p\u003e\n\n\u003ch2\u003eWhat an 8m tower is for\u003c\/h2\u003e\n\u003cp\u003e7.84m reaches the eaves of a three-storey London terrace and the top of most Victorian bay elevations. Inside, it covers atrium glazing, plant rooms and the tall interiors you find in churches, halls and converted industrial units.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eThree-storey fascias, gutters and eaves\u003c\/li\u003e\n\u003cli\u003eVictorian terrace elevations and bay windows\u003c\/li\u003e\n\u003cli\u003eAtrium glazing, plant rooms and service risers\u003c\/li\u003e\n\u003cli\u003eHalls, churches and converted industrial interiors\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eMostly hired by \u003ca href=\"\/pages\/use-cases\/painters\"\u003epainters\u003c\/a\u003e, \u003ca href=\"\/pages\/use-cases\/decorators\"\u003edecorators\u003c\/a\u003e, \u003ca href=\"\/pages\/use-cases\/electricians\"\u003eelectricians\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eIs 7.84m the right height for you?\u003c\/h2\u003e\n\u003cp\u003eYou stand on the platform at \u003cstrong\u003e5.84m\u003c\/strong\u003e and work comfortably to about \u003cstrong\u003e7.8m\u003c\/strong\u003e — that reaches the roofline and bargeboards of a two-storey house. Measure to the highest point you actually need to touch and take off roughly two metres; if the number you are left with is near 7.84, this is your tower. Working lower than that? The \u003ca href=\"\/products\/single-width-scaffold-tower-hire-6m\"\u003e6m version\u003c\/a\u003e works to 5.74m, which reaches the gutter line of a standard two-storey house. \u003c\/p\u003e\n\u003cp\u003eIf you are between two heights, the \u003ca href=\"\/pages\/scaffold-tower-height-guide\"\u003eheight guide\u003c\/a\u003e works through it, and \u003ca href=\"\/pages\/how-to-choose-a-scaffold-tower\"\u003ehow to choose a scaffold tower\u003c\/a\u003e covers the rest of the decision.\u003c\/p\u003e\n\n\u003ch2\u003eWill it fit, and can you get it there?\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003e1.8m x 0.75m\u003c\/strong\u003e keeps the 750mm width that gets through a standard internal doorway, a side return or a communal corridor, while giving you 1.8m of platform to work along. It is the balance most interior and terrace work wants.\u003c\/p\u003e\n\u003cp\u003eCheck the turn as well as the doorway — a hallway with a tight corner can stop a 1.8m component even when the door is wide enough. The \u003ca href=\"\/pages\/scaffold-tower-size-guide\"\u003esize guide\u003c\/a\u003e covers measuring the narrowest point, the floor area including stabilisers, and the clear height you need while building.\u003c\/p\u003e\n\n\n\u003ch2\u003eSpecification\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eWorking height:\u003c\/strong\u003e 7.84m \u003cem\u003e— the highest point you can comfortably reach\u003c\/em\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePlatform height:\u003c\/strong\u003e 5.84m \u003cem\u003e— the deck you stand on\u003c\/em\u003e\n\u003c\/li\u003e\n\n\u003cli\u003e\n\u003cstrong\u003eTower footprint:\u003c\/strong\u003e 1.8m x 0.75m\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBoarded deck:\u003c\/strong\u003e 1.80m x 0.60m\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTower width:\u003c\/strong\u003e 750mm\u003c\/li\u003e\n\n\u003cli\u003e\n\u003cstrong\u003eGuardrail system:\u003c\/strong\u003e Advanced (AGR)\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStandard:\u003c\/strong\u003e EN 1004\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSafe working load:\u003c\/strong\u003e on the manufacturer's plate and in the assembly guide supplied with the tower\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eWhat is in the load\u003c\/h2\u003e\n\u003cp\u003eEvery part of this configuration, with the manufacturer's part codes and weights. Worth a\ncount on delivery, and worth a look before you plan the carry.\u003c\/p\u003e\n\u003ctable\u003e\n\u003cthead\u003e\u003ctr\u003e\n\u003cth\u003ePart\u003c\/th\u003e\n\u003cth\u003eQty\u003c\/th\u003e\n\u003cth\u003eEach\u003c\/th\u003e\n\u003c\/tr\u003e\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eMCKAT \u003cem\u003e(katlanir taban, hepsinde var)\u003c\/em\u003e\n\u003c\/td\u003e\n\u003ctd\u003e1\u003c\/td\u003e\n\u003ctd\u003e16.4kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMC-2000X750\u003c\/td\u003e\n\u003ctd\u003e4\u003c\/td\u003e\n\u003ctd\u003e7.8kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMC-1000X750\u003c\/td\u003e\n\u003ctd\u003e2\u003c\/td\u003e\n\u003ctd\u003e4.2kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMYTY-1850\u003c\/td\u003e\n\u003ctd\u003e2\u003c\/td\u003e\n\u003ctd\u003e1.8kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eSAFEKOR-1800X1250\u003c\/td\u003e\n\u003ctd\u003e8\u003c\/td\u003e\n\u003ctd\u003e6.2kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMTKR-150\u003c\/td\u003e\n\u003ctd\u003e4\u003c\/td\u003e\n\u003ctd\u003e4.7kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMKPLT-1800X600\u003c\/td\u003e\n\u003ctd\u003e3\u003c\/td\u003e\n\u003ctd\u003e14kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMPAY-2000\u003c\/td\u003e\n\u003ctd\u003e4\u003c\/td\u003e\n\u003ctd\u003e4.7kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMTEK-1800X750\u003c\/td\u003e\n\u003ctd\u003e1\u003c\/td\u003e\n\u003ctd\u003e7.5kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eYAYLI PIM\u003c\/td\u003e\n\u003ctd\u003e12\u003c\/td\u003e\n\u003ctd\u003e0.1kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\n\u003c\/table\u003e\n\n\u003ch2\u003eWhat comes with the hire\u003c\/h2\u003e\n\u003ch3\u003eAdvanced guardrail (AGR) build-up\u003c\/h3\u003e\n\u003cp\u003eOn a standard tower you climb to the new level and fit its guardrail once you are\nstanding there. On this one the guardrail frame is raised into place \u003cstrong\u003efrom the platform\nbelow\u003c\/strong\u003e and locked before anyone steps up, so no operative ever stands on an unprotected\nlevel while the tower goes up or comes down.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHire this one if:\u003c\/strong\u003e you are on a managed or principal-contractor site, AGR\nor \"collective fall protection during assembly\" is written into the RAMS or method statement, your\nclient audits build-up method, or the tower goes up and down repeatedly through the job.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eThe standard tower is enough if:\u003c\/strong\u003e you are a sole trader or small team on\ndomestic work, you build the tower once and leave it up, and nobody is asking you to evidence the\nassembly method. It is the same aluminium, the same platform, the same working height and the same\nguardrails once the tower is built — the difference is entirely in how those guardrails get\nthere.\u003c\/p\u003e\n\u003cp\u003eThe AGR version is \u003cstrong\u003e£20 a week more\u003c\/strong\u003e. That is the whole difference in price, and\nwe would rather you hired the cheaper one than paid for a specification nobody asked you for.\u003c\/p\u003e\n\n\u003ch3\u003eInspected before it leaves the yard\u003c\/h3\u003e\n\u003cp\u003eFrames, braces, platforms, guardrails, toeboards and castors are checked on every turnaround. Anything bent, cracked or worn comes out of service rather than going back on the shelf. See our \u003ca href=\"\/pages\/safety-and-quality\"\u003esafety and quality standards\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eWhat the weekly price covers\u003c\/h2\u003e\n\u003cp\u003eThe figure on this page is what you pay. Guardrails, toeboards, stabilisers and lockable\ncastors come with the tower, not on the invoice — and there is \u003cstrong\u003eno deposit and no card\nhold\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded:\u003c\/strong\u003e delivery and collection within 30km of our Cheshunt yard\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e£45:\u003c\/strong\u003e delivery and collection beyond 30km — both legs, once per order\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eOptional:\u003c\/strong\u003e installation and dismantling, if nobody on your team is PASMA trained\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eVAT:\u003c\/strong\u003e included in the price shown, never added at checkout\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eThe full line-by-line list — what is in the price and what is not — is in the\n\u003ca href=\"\/pages\/hire-terms\"\u003ehire terms\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eHow this tower goes up\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eWho may build it:\u003c\/strong\u003e under the Work at Height Regulations 2005 a tower must be\nassembled by someone competent to do it — in practice, PASMA trained on this type of tower. If\nnobody on your team holds that, add our optional installation service and we will build it on\ndelivery and take it down at collection.\u003c\/p\u003e\n\u003cp\u003eThese are the manufacturer's own assembly diagrams for this configuration. The full guide\ncomes with the tower.\u003c\/p\u003e\n\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/p39.png?v=1787661025\" alt=\"Assembly sequence for the 8M tower, manufacturer diagram\" loading=\"lazy\" width=\"900\"\u003e\n\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/p40.png?v=1787661031\" alt=\"Assembly sequence for the 8M tower, manufacturer diagram\" loading=\"lazy\" width=\"900\"\u003e\n\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/p41.png?v=1787661035\" alt=\"Assembly sequence for the 8M tower, manufacturer diagram\" loading=\"lazy\" width=\"900\"\u003e\n\n\u003cp\u003eDismantling is the same sequence in reverse. The\n\u003ca href=\"\/blogs\/blog\/how-to-put-up-a-scaffold-tower\"\u003eassembly guide\u003c\/a\u003e explains the principle\nbehind the order, and the \u003ca href=\"\/pages\/pasma-guide\"\u003ePASMA guide\u003c\/a\u003e covers the training.\u003c\/p\u003e\n\n\u003ch2\u003eThe manufacturer's limits\u003c\/h2\u003e\n\u003cp\u003eFrom the assembly and use manual supplied with this tower — the manufacturer's figures, not\nour interpretation of them.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eWind:\u003c\/strong\u003e stop work above \u003cstrong\u003e38 km\/h\u003c\/strong\u003e (about 24 mph, Beaufort 6), and never try to move the tower in wind.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eGround:\u003c\/strong\u003e level, flat and firm. On soft ground put base plates or U-profiles under the castors.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eAssembly:\u003c\/strong\u003e two people minimum, and both trained on this type of tower.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStabilisers:\u003c\/strong\u003e required at this height — out to full span before anyone climbs.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRest platform:\u003c\/strong\u003e one at least every 4m, so this configuration needs 1 on the way up.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMoving it:\u003c\/strong\u003e drop the height to 6m first, raise the stabilisers no more than 10cm, and nobody stays on the tower.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eCertified to \u003cstrong\u003eEN 1004\u003c\/strong\u003e. The full set of limits — loading, sheeting, inspection\nintervals and what the tower must never be used for — is on the\n\u003ca href=\"\/pages\/scaffold-tower-safety-guide\"\u003esafety guide\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eOther sizes and configurations\u003c\/h2\u003e\n\u003cul\u003e\u003cli\u003e\n\u003ca href=\"\/products\/single-width-scaffold-tower-hire-6m\"\u003e6m Single Width Scaffold Tower Hire — 1.8m x 0.75m Platform\u003c\/a\u003e — one size down\u003c\/li\u003e\u003c\/ul\u003e\u003cp\u003eOr see every size in the range on the \u003ca href=\"\/collections\/single-width-scaffold-tower-hire\"\u003esingle width scaffold tower hire collection\u003c\/a\u003e, and the full fleet under \u003ca href=\"\/collections\/scaffold-tower-hire\"\u003escaffold tower hire\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eDelivery, collection and hire terms\u003c\/h2\u003e\n\u003cp\u003eDelivery and collection are \u003cstrong\u003efree within 30km\u003c\/strong\u003e of our Cheshunt yard — North and East London, south Hertfordshire and west Essex — and a flat \u003cstrong\u003e£45\u003c\/strong\u003e for both legs beyond that. Enter your postcode above and you will see which applies, plus your earliest date and slot, before you pay. See \u003ca href=\"\/pages\/delivery-information\"\u003edelivery information\u003c\/a\u003e and \u003ca href=\"\/pages\/delivery-areas\"\u003eevery area we cover\u003c\/a\u003e.\u003c\/p\u003e\n\u003cp\u003eMinimum hire is one week; a single day is charged as one week. The weekly rate drops from four weeks, and 15% comes off automatically when you hire three or more towers on one order. No deposit is held on your card. Full detail in our \u003ca href=\"\/pages\/hire-terms\"\u003ehire terms\u003c\/a\u003e.\u003c\/p\u003e","brand":"London Scaffold Tower Hire","offers":[{"title":"1 Week","offer_id":58521879511414,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-8M-1W","price":189.99,"currency_code":"GBP","in_stock":true},{"title":"2 Weeks","offer_id":58521879544182,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-8M-2W","price":322.99,"currency_code":"GBP","in_stock":true},{"title":"3 Weeks","offer_id":58521879576950,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-8M-3W","price":455.99,"currency_code":"GBP","in_stock":true},{"title":"4 Weeks","offer_id":58521879609718,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-8M-4W","price":569.99,"currency_code":"GBP","in_stock":true},{"title":"5 Weeks","offer_id":58521879642486,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-8M-5W","price":683.99,"currency_code":"GBP","in_stock":true},{"title":"6 Weeks","offer_id":58521879675254,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-8M-6W","price":797.99,"currency_code":"GBP","in_stock":true},{"title":"7 Weeks","offer_id":58521879708022,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-8M-7W","price":901.99,"currency_code":"GBP","in_stock":true},{"title":"8 Weeks","offer_id":58521879740790,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-8M-8W","price":1006.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/manual-single-width-scaffold-tower-hire-8m.png?v=1787684259"},{"product_id":"single-width-scaffold-tower-hire-3m","title":"3m Single Width Scaffold Tower Hire — 1.8m x 0.75m Platform","description":"\u003cp\u003eHire a \u003cstrong\u003e3m single width scaffold tower\u003c\/strong\u003e in London from \u003cstrong\u003e£89.99 a week\u003c\/strong\u003e, delivered free within 30km of our Cheshunt yard and collected at the end of your hire. 2.81m working height on a doorway-width tower with a usable run, 1.8m x 0.75m.\u003c\/p\u003e\n\n\u003ch2\u003eWhat a 3m tower is for\u003c\/h2\u003e\n\u003cp\u003eA 2.81m working height puts you at the gutter line of a bungalow, the ground floor of a house, or a normal interior ceiling with room to work above your head. It is the height most decorating, first-fix electrical and light maintenance jobs actually need — and the one people most often over-buy.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eInterior ceilings, coving and cornice\u003c\/li\u003e\n\u003cli\u003eLight fittings, smoke detectors and ceiling roses\u003c\/li\u003e\n\u003cli\u003eGround-floor windows, fascias and soffits\u003c\/li\u003e\n\u003cli\u003eShop and office fit-out, signage and display\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eMostly hired by \u003ca href=\"\/pages\/use-cases\/decorators\"\u003edecorators\u003c\/a\u003e, \u003ca href=\"\/pages\/use-cases\/painters\"\u003epainters\u003c\/a\u003e, \u003ca href=\"\/pages\/use-cases\/electricians\"\u003eelectricians\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eIs 2.81m the right height for you?\u003c\/h2\u003e\n\u003cp\u003eYou stand on the platform at \u003cstrong\u003e0.81m\u003c\/strong\u003e and work comfortably to about \u003cstrong\u003e2.8m\u003c\/strong\u003e — that reaches a normal domestic ceiling with room to work above your head. Measure to the highest point you actually need to touch and take off roughly two metres; if the number you are left with is near 2.81, this is your tower.  Need to go higher? The \u003ca href=\"\/products\/single-width-scaffold-tower-hire-4m\"\u003e4m version\u003c\/a\u003e works to 3.81m, which reaches the gutter of a bungalow, a garage roof or a shopfront fascia.\u003c\/p\u003e\n\u003cp\u003eIf you are between two heights, the \u003ca href=\"\/pages\/scaffold-tower-height-guide\"\u003eheight guide\u003c\/a\u003e works through it, and \u003ca href=\"\/pages\/how-to-choose-a-scaffold-tower\"\u003ehow to choose a scaffold tower\u003c\/a\u003e covers the rest of the decision.\u003c\/p\u003e\n\n\u003ch2\u003eWill it fit, and can you get it there?\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003e1.8m x 0.75m\u003c\/strong\u003e keeps the 750mm width that gets through a standard internal doorway, a side return or a communal corridor, while giving you 1.8m of platform to work along. It is the balance most interior and terrace work wants.\u003c\/p\u003e\n\u003cp\u003eCheck the turn as well as the doorway — a hallway with a tight corner can stop a 1.8m component even when the door is wide enough. The \u003ca href=\"\/pages\/scaffold-tower-size-guide\"\u003esize guide\u003c\/a\u003e covers measuring the narrowest point, the floor area including stabilisers, and the clear height you need while building.\u003c\/p\u003e\n\n\n\u003ch2\u003eSpecification\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eWorking height:\u003c\/strong\u003e 2.81m \u003cem\u003e— the highest point you can comfortably reach\u003c\/em\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePlatform height:\u003c\/strong\u003e 0.81m \u003cem\u003e— the deck you stand on\u003c\/em\u003e\n\u003c\/li\u003e\n\n\u003cli\u003e\n\u003cstrong\u003eTower footprint:\u003c\/strong\u003e 1.8m x 0.75m\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBoarded deck:\u003c\/strong\u003e 1.80m x 0.60m\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTower width:\u003c\/strong\u003e 750mm\u003c\/li\u003e\n\n\u003cli\u003e\n\u003cstrong\u003eGuardrail system:\u003c\/strong\u003e Advanced (AGR)\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStandard:\u003c\/strong\u003e EN 1004\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSafe working load:\u003c\/strong\u003e on the manufacturer's plate and in the assembly guide supplied with the tower\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eWhat is in the load\u003c\/h2\u003e\n\u003cp\u003eEvery part of this configuration, with the manufacturer's part codes and weights. Worth a\ncount on delivery, and worth a look before you plan the carry.\u003c\/p\u003e\n\u003ctable\u003e\n\u003cthead\u003e\u003ctr\u003e\n\u003cth\u003ePart\u003c\/th\u003e\n\u003cth\u003eQty\u003c\/th\u003e\n\u003cth\u003eEach\u003c\/th\u003e\n\u003c\/tr\u003e\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eMCKAT \u003cem\u003e(katlanir taban, hepsinde var)\u003c\/em\u003e\n\u003c\/td\u003e\n\u003ctd\u003e1\u003c\/td\u003e\n\u003ctd\u003e16.4kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMC-1000X750\u003c\/td\u003e\n\u003ctd\u003e2\u003c\/td\u003e\n\u003ctd\u003e4.2kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMYTY-1850\u003c\/td\u003e\n\u003ctd\u003e1\u003c\/td\u003e\n\u003ctd\u003e1.8kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eSAFEKOR-1800X1250\u003c\/td\u003e\n\u003ctd\u003e4\u003c\/td\u003e\n\u003ctd\u003e6.2kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMTKR-150\u003c\/td\u003e\n\u003ctd\u003e4\u003c\/td\u003e\n\u003ctd\u003e4.7kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMKPLT-1800X600\u003c\/td\u003e\n\u003ctd\u003e1\u003c\/td\u003e\n\u003ctd\u003e14kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMPAY-2000\u003c\/td\u003e\n\u003ctd\u003e4\u003c\/td\u003e\n\u003ctd\u003e4.7kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMTEK-1800X750\u003c\/td\u003e\n\u003ctd\u003e1\u003c\/td\u003e\n\u003ctd\u003e7.5kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eYAYLI PIM\u003c\/td\u003e\n\u003ctd\u003e4\u003c\/td\u003e\n\u003ctd\u003e0.1kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\n\u003c\/table\u003e\n\n\u003ch2\u003eWhat comes with the hire\u003c\/h2\u003e\n\u003ch3\u003eAdvanced guardrail (AGR) build-up\u003c\/h3\u003e\n\u003cp\u003eOn a standard tower you climb to the new level and fit its guardrail once you are\nstanding there. On this one the guardrail frame is raised into place \u003cstrong\u003efrom the platform\nbelow\u003c\/strong\u003e and locked before anyone steps up, so no operative ever stands on an unprotected\nlevel while the tower goes up or comes down.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHire this one if:\u003c\/strong\u003e you are on a managed or principal-contractor site, AGR\nor \"collective fall protection during assembly\" is written into the RAMS or method statement, your\nclient audits build-up method, or the tower goes up and down repeatedly through the job.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eThe standard tower is enough if:\u003c\/strong\u003e you are a sole trader or small team on\ndomestic work, you build the tower once and leave it up, and nobody is asking you to evidence the\nassembly method. It is the same aluminium, the same platform, the same working height and the same\nguardrails once the tower is built — the difference is entirely in how those guardrails get\nthere.\u003c\/p\u003e\n\u003cp\u003eThe AGR version is \u003cstrong\u003e£20 a week more\u003c\/strong\u003e. That is the whole difference in price, and\nwe would rather you hired the cheaper one than paid for a specification nobody asked you for.\u003c\/p\u003e\n\n\u003ch3\u003eInspected before it leaves the yard\u003c\/h3\u003e\n\u003cp\u003eFrames, braces, platforms, guardrails, toeboards and castors are checked on every turnaround. Anything bent, cracked or worn comes out of service rather than going back on the shelf. See our \u003ca href=\"\/pages\/safety-and-quality\"\u003esafety and quality standards\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eWhat the weekly price covers\u003c\/h2\u003e\n\u003cp\u003eThe figure on this page is what you pay. Guardrails, toeboards, stabilisers and lockable\ncastors come with the tower, not on the invoice — and there is \u003cstrong\u003eno deposit and no card\nhold\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded:\u003c\/strong\u003e delivery and collection within 30km of our Cheshunt yard\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e£45:\u003c\/strong\u003e delivery and collection beyond 30km — both legs, once per order\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eOptional:\u003c\/strong\u003e installation and dismantling, if nobody on your team is PASMA trained\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eVAT:\u003c\/strong\u003e included in the price shown, never added at checkout\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eThe full line-by-line list — what is in the price and what is not — is in the\n\u003ca href=\"\/pages\/hire-terms\"\u003ehire terms\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eHow this tower goes up\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eWho may build it:\u003c\/strong\u003e under the Work at Height Regulations 2005 a tower must be\nassembled by someone competent to do it — in practice, PASMA trained on this type of tower. If\nnobody on your team holds that, add our optional installation service and we will build it on\ndelivery and take it down at collection.\u003c\/p\u003e\n\u003cp\u003eThese are the manufacturer's own assembly diagrams for this configuration. The full guide\ncomes with the tower.\u003c\/p\u003e\n\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/p39.png?v=1787661025\" alt=\"Assembly sequence for the 4M tower, manufacturer diagram\" loading=\"lazy\" width=\"900\"\u003e\n\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/p40.png?v=1787661031\" alt=\"Assembly sequence for the 4M tower, manufacturer diagram\" loading=\"lazy\" width=\"900\"\u003e\n\u003cimg src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/p41.png?v=1787661035\" alt=\"Assembly sequence for the 4M tower, manufacturer diagram\" loading=\"lazy\" width=\"900\"\u003e\n\u003cp\u003e\u003cstrong\u003eBuild sequence for the 4M:\u003c\/strong\u003e steps 1-2-3-4-5-6-7-8-9-12-13-14-15, following the numbered diagrams above.\u003c\/p\u003e\n\u003cp\u003eDismantling is the same sequence in reverse. The\n\u003ca href=\"\/blogs\/blog\/how-to-put-up-a-scaffold-tower\"\u003eassembly guide\u003c\/a\u003e explains the principle\nbehind the order, and the \u003ca href=\"\/pages\/pasma-guide\"\u003ePASMA guide\u003c\/a\u003e covers the training.\u003c\/p\u003e\n\n\u003ch2\u003eThe manufacturer's limits\u003c\/h2\u003e\n\u003cp\u003eFrom the assembly and use manual supplied with this tower — the manufacturer's figures, not\nour interpretation of them.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eWind:\u003c\/strong\u003e stop work above \u003cstrong\u003e38 km\/h\u003c\/strong\u003e (about 24 mph, Beaufort 6), and never try to move the tower in wind.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eGround:\u003c\/strong\u003e level, flat and firm. On soft ground put base plates or U-profiles under the castors.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eAssembly:\u003c\/strong\u003e two people minimum, and both trained on this type of tower.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eCertified to \u003cstrong\u003eEN 1004\u003c\/strong\u003e. The full set of limits — loading, sheeting, inspection\nintervals and what the tower must never be used for — is on the\n\u003ca href=\"\/pages\/scaffold-tower-safety-guide\"\u003esafety guide\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eOther sizes and configurations\u003c\/h2\u003e\n\u003cul\u003e\u003cli\u003e\n\u003ca href=\"\/products\/single-width-scaffold-tower-hire-4m\"\u003e4m Single Width Scaffold Tower Hire — 1.8m x 0.75m Platform\u003c\/a\u003e — one size up\u003c\/li\u003e\u003c\/ul\u003e\u003cp\u003eOr see every size in the range on the \u003ca href=\"\/collections\/single-width-scaffold-tower-hire\"\u003esingle width scaffold tower hire collection\u003c\/a\u003e, and the full fleet under \u003ca href=\"\/collections\/scaffold-tower-hire\"\u003escaffold tower hire\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eDelivery, collection and hire terms\u003c\/h2\u003e\n\u003cp\u003eDelivery and collection are \u003cstrong\u003efree within 30km\u003c\/strong\u003e of our Cheshunt yard — North and East London, south Hertfordshire and west Essex — and a flat \u003cstrong\u003e£45\u003c\/strong\u003e for both legs beyond that. Enter your postcode above and you will see which applies, plus your earliest date and slot, before you pay. See \u003ca href=\"\/pages\/delivery-information\"\u003edelivery information\u003c\/a\u003e and \u003ca href=\"\/pages\/delivery-areas\"\u003eevery area we cover\u003c\/a\u003e.\u003c\/p\u003e\n\u003cp\u003eMinimum hire is one week; a single day is charged as one week. The weekly rate drops from four weeks, and 15% comes off automatically when you hire three or more towers on one order. No deposit is held on your card. Full detail in our \u003ca href=\"\/pages\/hire-terms\"\u003ehire terms\u003c\/a\u003e.\u003c\/p\u003e","brand":"London Scaffold Tower Hire","offers":[{"title":"1 Week","offer_id":58535516012918,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-3M-1W","price":89.99,"currency_code":"GBP","in_stock":true},{"title":"2 Weeks","offer_id":58535516045686,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-3M-2W","price":152.99,"currency_code":"GBP","in_stock":true},{"title":"3 Weeks","offer_id":58535516078454,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-3M-3W","price":215.99,"currency_code":"GBP","in_stock":true},{"title":"4 Weeks","offer_id":58535516111222,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-3M-4W","price":269.99,"currency_code":"GBP","in_stock":true},{"title":"5 Weeks","offer_id":58535516143990,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-3M-5W","price":323.99,"currency_code":"GBP","in_stock":true},{"title":"6 Weeks","offer_id":58535516176758,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-3M-6W","price":377.99,"currency_code":"GBP","in_stock":true},{"title":"7 Weeks","offer_id":58535516209526,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-3M-7W","price":426.99,"currency_code":"GBP","in_stock":true},{"title":"8 Weeks","offer_id":58535516242294,"sku":"SINGLE-WIDTH-SCAFFOLD-TOWER-HIRE-3M-8W","price":476.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1009\/5077\/0038\/files\/manual-single-width-scaffold-tower-hire-3m_921bfffe-b0d8-4b83-a1ae-1a323f114740.png?v=1787684260"}],"url":"https:\/\/londonscaffoldtowerhire.co.uk\/collections\/single-width-scaffold-tower-hire.oembed","provider":"London Scaffold Tower Hire","version":"1.0","type":"link"}